Pricing

How much more should I charge a client who wants fast turnaround?

There's no universal rush-fee percentage, the right add-on is whatever actually compensates you for the disruption: work you have to push back, hours outside your normal schedule, or the risk that comes with less room to catch mistakes. Set the number from that disruption, not from a flat rule, and say plainly that it's a rush fee rather than folding it quietly into a bigger total.

Frederik BrandtNovember 17, 2026

There's no one correct rush-fee percentage. The right add-on is whatever actually compensates you for what the rush costs you, and that cost is different for every request, so a flat rule ("always add 30%") ends up either underpaying you on the hard ones or overcharging on the easy ones.

What a rush fee is actually paying for

The extra hours usually aren't the real cost of a fast turnaround, most rush jobs don't even take more total hours than a normal one would. What you're charging for is the disruption: other work you have to push back, evenings or a weekend you weren't planning to work, and the risk that comes with less room to catch mistakes or handle something going wrong along the way. A rush fee prices that disruption, not the clock.

Set the number from what the rush actually costs you

Work out the add-on from the real disruption instead of defaulting to a round number:

  • If it means reshuffling other client work or giving up time you'd normally have off, that calls for a bigger add-on than a rush that just moves your own to-do list around.
  • If the deadline is tight enough that you're skipping your normal review or buffer time, factor that risk in too, not just the hours it costs you.
  • If a client who wants speed is an easy "yes" because it fits your schedule anyway, the honest add-on might be small or even zero, the fee exists to cover real disruption, not as a toll on every fast request by default.

You're free to pick your own go-to add-on and apply it consistently once you've used this once or twice, that's your call to make based on what you've seen it actually cost you, not a number someone else can hand you upfront.

Say the number plainly, don't bury it in the proposal

Tell the client the rush fee exists and roughly why, rather than quietly folding it into a bigger total and hoping they don't ask. Most clients asking for fast turnaround already expect to pay something for it, so naming it directly ("this includes a rush fee because it means working the weekend") tends to land better than a total that looks unexplained.

Steadytrack's proposal flow lets you add a rush fee as its own line next to the base price, so the client sees exactly what the speed is costing them instead of a single total they have to take on faith.

Ready to send your next proposal?

Set the right price and send a professional proposal, without the guesswork.

kr./month